The process giving confidence that the project will meet appropriate quality standards is called ______.
A.
scope verification
B.
perform quality control
C.
perform quality assurance
D.
quality planning
点击查看答案
2
单选题
1分
The statistical method that looks at the influence of different factors on specific variables is called ______.
A.
design of experiments
B.
benchmarking
C.
variability of factors
D.
ISO
点击查看答案
3
单选题
1分
Which of the following has the greatest effect on a product's reliability and maintenance characteristic?
A.
Conceptualization.
B.
Product design.
C.
Fabrication.
D.
A and
点击查看答案
4
单选题
1分
On a project the project manager should strive for a "Quality Level" that ______.
A.
is the highest level possible
B.
is as close to the project objectives as possible
C.
represents the least cost to the project
D.
exceeds the specified requirement of the project
点击查看答案
5
单选题
1分
Perform quality control in the final analysis is ______.
A.
using the technical procedures of monitoring project results to decide if the outputs meet the requirements
B.
a production system
C.
a inspection system
D.
fitness for purpose
点击查看答案
百度扫一扫练题
关注千题库公众号
PMP资格认证考试-题库
千题库下载
历年真题
历年考试真题试卷, 真实检验
章节练习
按章节做题, 系统练习不遗漏
考前押题
考前押题, 提高分数
模拟试题
海量考试试卷及答案, 分数评估
进入题库
相关试卷
综合练习
章节练习
组织影响与项目生命周期
项目整合管理(四)
项目整体管理
项目质量管理
项目质量管理(一)
项目质量管理(二)
项目质量管理(三)
项目质量管理(四)
项目质量管理(五)
引论
收藏本站
Ctrl+D
将本站加入到书签,做题找题搜题,快速快捷。
下载App
微信扫一扫打开
回到顶部