问答题 6分

When a nominated surveyor or recognized organization determines that the condition of the ship or it...

When a nominated surveyor or recognized organization determines that the condition of the ship or its
equipment does not correspond substantially with the particulars of the Certificate (IOPP) or is such that
the ship is not fit to proceed to sea without presenting an unreasonable threat of harm to the marine
environment, such surveyor or organization shall immediately ensure that corrective action is taken and
shall in due course notify the Administration. If such corrective action is not taken, the Certificate shall be
withdrawn and the Administration shall be notified immediately; and if the ship is in a port of another Party,
the appropriate authorities of the port State shall also be notified immediately. When an officer of the
Administration, a nominated surveyor or a recognized organization has notified the appropriate authorities
of the port State, the Government of the port State concerned shall give such officer, surveyor or
organization any necessary assistance to carry out their obligations under this regulation. When applicable,
the Government of the port State concerned shall take such steps as will ensure that the ship shall not sail
until it can proceed to sea or leave the port for the purpose of proceeding to the nearest appropriate repair
yard available without presenting an unreasonable threat of harm to the marine environment.
Whenever an accident occurs to a ship or a defect is discovered which substantially affects the
integrity of the ship or the efficiency or completeness of its equipment covered by this Annex the master or
owner of the ship shall report at the earliest opportunity to the Administration, the recognized organization
or the nominated surveyor responsible for issuing the relevant Certificate, who shall cause investigations to
be initiated to determine whether a survey as required by paragraph 1 of this regulation is necessary. If the
ship is in a port of another Party, the master or owner shall also report immediately to the appropriate
authorities of the port State and the nominated surveyor or recognized organization shall ascertain that such
report has been made.

你可能感兴趣的试题

5 问答题 6分
For a certain provision cooling plant, the capacity regulator is generally controlled depending on
pressure, temperature or relative humidity. The pulse emitter is therefore either a pressostat(压力继电器),
thermostat or hygrostat. The switching difference of the control units should be rated as large as possible.
This applies in particular to control by means of the pressure, because change to the load in the
refrigeration circuit results in relatively quick pressure changes compared to temperature, which can in turn
lead to inadmissible oscillation of the regulator.

Under partial load, the suction volume and thus the gas speed can undergo marked changes depending on the
regulation stage. For this reason, the rating and routing of the suction line must be given particular attention.
In order to guarantee sufficient oil return, neither full load nor partial load operation may allow the gas speed
to fall below a minimum level: 4 m/s in horizontal pipe sections; 8 m/s in vertical pipes.

For this reason we recommend that vertical pipes bestaggered into two separate sections (as illustration).
As a result of the falling suction gas speed velocity in partial load operation, the pipe elbow B is
blocked by an accumulation of oil. This increases the gas velocity in pipe section A. In order to guarantee adequate
oil return, both cross sections must be rated so large that the velocity does not fall below the minimum level
in full and partial load operation. In plants with extensive pipe systems it is recommended at least for R22 and NH3
to install an additional oil separator. This reduces the oil circulation period and can have positive effects above
all for cold starts with relatively high oil ejection.