单选题
1分
The officer in charge of the engineering watch shall ensure that all machinery involved with the man...
The officer in charge of the engineering watch shall ensure that all machinery involved with the maneuvering of the ship can be immediately be placed in the manual mode of operation when notified that the ship is _____.
参考答案: C