单选题 1分

You work for an architectural-engineering firm and are responsible for designing the world's most ad...

You work for an architectural-engineering firm and are responsible for designing the world's most advanced chicken coop. The project is highly complex and will require hundreds of drawings. You multiply the number of drawing by the hours needed to produce each drawing to estimate how long the coop will take to design. This results in which one of the following estimate types?
  • A.Quantitatively base
  • B.Exper
  • C.Analogou
  • D.Parametri

你可能感兴趣的试题

1 单选题 1分
  • A.Fast track the project to ensure that the project schedule is not delaye
  • B.Review the performance reports to determine which planned dates have not been met, and the impact on critical pat
  • C.Try to get additional supplies from an alternate location as soon as possibl
  • D.Take corrective action to minimize the impact because of the dela
3 单选题 1分
  • A.the critical path is reduced
  • B.the contingency is no longer available
  • C.no float time is available
  • D.project resources are reduced
4 单选题 1分
  • A.Start-to-start, start-to-finish, finish-to-finish, finish-to-star
  • B.Early start, early finish, late start, late finis
  • C.Predecessor-to-successor, predecessor-to-predecessor, successor-to-successo
  • D.Primary-to-secondary, primary-to-finish, secondary-to-secondary, finish-to-finis