单选题 1分

Critical chain is a schedule network analysis technique that modifies the project schedule to accoun...

Critical chain is a schedule network analysis technique that modifies the project schedule to account for limited resources. Critical chain combines deterministic and probabilistic approaches. Initially, the project schedule network diagram is build using non-conservative estimates for activity durations within the schedule model, with required dependencies and defined constraints as inputs. The critical path is then calculated. After the critical path is identified, resource availability is entered and the resource-limited schedule result is determined. The resulting schedule often has an altered critical path. The critical chain method adds non-work schedule activities to maintain focus on the planned activity durations, also referred to as ______ .
  • A.duration buffers
  • B.resource leveling
  • C.reverse resource leveling
  • D.crashing

你可能感兴趣的试题

1 单选题 1分
  • A.Fast track the project to ensure that the project schedule is not delaye
  • B.Review the performance reports to determine which planned dates have not been met, and the impact on critical pat
  • C.Try to get additional supplies from an alternate location as soon as possibl
  • D.Take corrective action to minimize the impact because of the dela
3 单选题 1分
  • A.the critical path is reduced
  • B.the contingency is no longer available
  • C.no float time is available
  • D.project resources are reduced
4 单选题 1分
  • A.Start-to-start, start-to-finish, finish-to-finish, finish-to-star
  • B.Early start, early finish, late start, late finis
  • C.Predecessor-to-successor, predecessor-to-predecessor, successor-to-successo
  • D.Primary-to-secondary, primary-to-finish, secondary-to-secondary, finish-to-finis