单选题 1分

A project team is in the design stage of a new mountain bike prototype. The team is in the process o...

A project team is in the design stage of a new mountain bike prototype. The team is in the process of identifying which type of frame and material will provide high performance at a low cost. Which of the following is the MOST likely technique used to determine these variables?
  • A.) Benefit/cost analysis.
  • B.) Ishikawa diagram.
  • C.) Design of experiments.
  • D.) System flow chart.

你可能感兴趣的试题

1 单选题 1分
  • A.) Risk identification.
  • B.) Quality assuranc
  • C.) Quality planning.
  • D.) Quality control.
3 单选题 1分
  • A.) the organization
  • B.) the project management team
  • C.) executive management
  • D.) the project
5 单选题 1分
  • A.) Notify management.
  • B.) Hold a team meeting.
  • C.) Look for alternative ways to meet the quality level.
  • D.) Ask management tp come up with options.